CALMAC
Summer 2017
Shetland Isles
NA
In 2017 Malakoff was awarded the contract to build the new Kerrera Ferry by Caledonian Maritime Assets Limited (CMAL). The ferry was designed by Alisdair Salmon as a landing craft, capable of carrying 1 car and 12 passengers. The vessel was constructed in a record time of 40 days and is now operated by Calmac Ferries Limited on the route linking Oban with the Island of Kerrera.
The vessel was manufactured & painted from our dedicated Boat Building facility by our skilled & dedicated team. The vessel specification is as follows: