Fortum O&M (UK) Ltd
October 2012 - July 2013
Shetland Isles
N/A
Malakoff were awarded the contract to complete the fabrication and installation of the replacement PSA Nitrogen Plant at the SVT Power Station.
Fabrication and assembly took place at Malakoff workshops and the completed unit was transported to site and lifted into position prior to tie in pipework being installed.